Abdallah, M A A (2014) Optimizing the selection of sustainability measures for existing buildings, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Adrian, J J (1974) Modeling construction method productivity, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Ahn, C (2012) An integrated framework for sustainable construction processes: Understanding and managing the environmental performance of construction operations, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Assaf, S A-E (1982) A systematic approach to the selection of a risk retention level for construction insurance, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Aurangzeb, Q (2014) Impact of reclaimed asphalt pavements on pavement sustainability, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Bearup, W K (1995) An environment to support computer-assisted design review, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Caldas, C H S (2003) Integration of project documents in model-based information systems, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Chin, S (1997) An integrated life-cycle information framework for construction project management, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Chovichien, V (1981) The discounted cost model and application to acquisition and utilization policies of construction equipment, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Echeverry, D (1991) Factors for generating initial construction schedules, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Erikson, C A (1979) Risk sharing in construction contracts, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Farid, F (1981) Fair and reasonable markup (FaRM) pricing model: A present value approach to pricing of construction contracts, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Gatton, T M (1991) Designing for construction automation: Advanced automation technologies for computer integrated construction, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Grimes, G A (2004) Recovering capital expenditures: The railroad industry paradox, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Grobler, F (1988) Object-oriented data representation for unified construction project information, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Han, S (2013) Automated monitoring and systemic analysis of workers' safety behavior in construction operations, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Harris, J R (1980) Organization of building standards: Systematic techniques for scope and arrangement, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Hassan, A A A (2019) Risk management of repetitive construction projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Hassanein, M A A G (1990) Mechanisms for transfer of price risk of construction materials, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Huang, P-D (1988) Impact of CADD technology on the architectural community, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Kang, Y-J (2000) Minimum life-cycle cost structural design against natural hazards, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Kauffold, P V (1977) Critical resource allocation in stochastic project networks, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Khalafallah, A M (2006) Optimal construction site layout planning for airport expansion projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Kim, C-S (2002) An information model for real-time project cost integration, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Kim, H (2002) Knowledge discovery and machine learning in construction project databases, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Kuipers, E J (1976) A method of forecasting the efficiency of construction labor in any climatological conditions, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Lin, K-Y (2005) Knowledge-assisted retrieval of online product information in A/E/C (architecture/engineering/construction), Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Lucenti, M J, Jr. (1999) Flexible computer support for collaboration in civil infrastructure management, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

  • Type: Thesis
  • Keywords: market; construction project; information retrieval; validation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304897104
  • Abstract:
    A project-specific dispute resolution ladder (DRL) typically consists of multiple alternative dispute resolution (ADR) techniques that are chosen to assist in mitigating the impact of change orders and claims (CCO) occurring during the project construction phase, and avoid their escalation to protracted disputes that adversely affect a construction project's budget, schedule and quality. The choice of which ADR techniques need to be included in the project-specific DRL depends on the construction project characteristics and the ADR properties. The project characteristics can be divided into organizational issues which include structure, process and people; as well as uncertainty issues that might be either internal or external in nature. These project characteristics have been found to be the direct sources of CCO's in construction projects, and to directly affect: (1) the total number of CCO's occurring during the construction phase of the project; (2) the severity of these CCO's in term of additional cost and time; and (3) the time of occurrence of these CCO's during the project construction phase. On the other hand, the ADR characteristics include the time required to achieve resolution of a given CCO, the effectiveness of the ADR in helping the parties achieve resolution, and finally the costs associated with implementing a single or multiple ADR from the project-specific DRL to achieve resolution. These costs vary depending on whether the CCO is negotiated between the owner and the contractor or whether a third party is asked to assist with the settlement in case negotiation efforts fail to achieve an agreeable resolution. It is typical for the construction project participants to decide on which ADR techniques to include in a project-specific DRL during the project planning phase prior to start of construction when information about any expected CCO's and the effectiveness of the ADR in resolving them cannot be assessed with certainty. Thus, the objective of this research is to develop a decision tool that guides the choice of the most effective and economic ADR techniques to be incorporated in a project-specific DRL based on the project characteristics as well as the ADR properties. In this sense, the current research focuses on integrating construction engineering and management concepts with financial engineering theories to develop a hybrid and dynamic system that evaluates the economic feasibility of implementing a project-specific DRL. An economic feasibility model that incorporates two main concepts from financial engineering to account for the uncertainty in the initial estimates of the project characteristics and ADR properties is developed. The first concept involves drawing an analogy from financial and real market options to account for the uncertainty in estimating the different cash flows generated from the DRL implementation during the construction phase of a project. The second concept correlates the effect of CCO's on the expected cost savings in a project from a given DRL implementation with exogenous competitive entry and its effect on the gross value of a capital project being evaluated using real option theory. In this case, the occurrence of a CCO during the construction phase of the project reduces the owner's expectations of the cost savings associated with the chosen DRL. If the DRL is successfully initiated at CCO occurrence, then part of the reduction in the expected cost savings might be recovered depending on the effectiveness of the ADR techniques implemented to resolve the issue. In addition to the theoretical contribution of this research, a system to evaluate cost-benefit tradeoffs of a given DRL implementation in a construction project is developed. This system allows project participants to develop a project-specific DRL from a built in library of ADR techniques available for implementation at the different levels of escalation of a CCO. Based on the chosen project-specific DRL, an investment plan that will allow the owner and the contractor to monitor deviations in th expected costs when the DRL is implemented as CCO's arise during the construction phase of a project is determined by the system. This plan will also allow both parties to decide how far they want to go in the dispute based on the projected costs of resolution.

Nakajima, T (1972) Modeling and optimization of the building process for systems building, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Niss, J F (1965) Custom production, theory and practice: With special emphasis on the goals and pricing procedures of the contract construction industry, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Nunlee, M P (2002) Reputation as a control mechanism for opportunistic behavior in supply chains, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

O'Shaughnessy, R D (1992) Criteria civil engineers use in deciding whether or not to participate in non-credit continuing engineering education programs, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Rehak, D R (1981) Computer aided engineering problems and prospects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Richards, J L (1973) An integrated approach to construction management, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Sarikas, R H (1981) Regulatory and financial aspects of the utility industry rate treatment of construction work in progress, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Steiger, T L (1988) Working construction: Organization and control of the labor process, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.

Zhang, J (2015) Automated code compliance checking in the construction domain using semantic natural language processing and logic-based reasoning, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.